Bâtiment en kit de 400m² pour altitude jusqu'à 400m
In Stock
Dimensions d'un bâtiment en kit de 400m², idéal pour une altitude jusqu'à 400m
In Stock
Bâtiment en kit de 400m² pour altitude jusqu'à 400m
In Stock
Bâtiment en kit de 400m² pour altitude jusqu'à 400m
Dimensions d'un bâtiment en kit de 400m², idéal pour une altitude jusqu'à 400m
Bâtiment en kit de 400m² pour altitude jusqu'à 400m

Open 400m² building for an altitude up to 400m

Client reviews :

Eligibility for building installation

If you are located in an area where climatic problems occur, please contact our experts by email or telephone to define your product.

Go further

Download our quality sheets with additional information.

Shape and sizes

Opening

Openned

Building area

398,40m2

Type of slope

Double slope (16%)

Width

16.6m

Length

24m

Height

5m

Rafter section

Ⅰ 300mm

Post section

Ⅰ 330mm

Purlins

C180mm galvanized

Covering

Type of roofing

0.63mm lacquered sheet metal

Ridge

Flat & Extra large

Side Bracing

Included

Bolts and fasteners

Included

Specificities

Specificity 1:

Building calculated for an installation up to 400m above sea level

Description

This 400² bi-slope building in kit form comes with a PRS High Resistance Steel, a hot-dip galvanized structure; and a reinforced 5-wave sheet metal roof. This robust and durable building helps you protect your machinery and equipment as well as your! Calculated by our experts for implementation in altitudes up to 400m.

 

The strengths of our 12.6x18x5m galvanized building:

 

Robustness and resistance

  • Suitable for an installation up to 400m altitude, reinforced sections
  • Ɪ profile structure thanks to High Resistance Steel, used in the construction of buildings of large dimensions and heights
  • Roof made of 1st choice 5-wave reinforced sheet metal, a unique model of sheet metal with 8% more resistance than conventional sheet metal, check our color chart
  • Optimal roof support thanks to C180mm purlins 9% stronger than the C160mm purlins usually offered on the market
 

Savings and sustainability thanks to the rust protection effect of hot-dip galvanization

  • Steel frame and elements are protected from rust for many years
  • No maintenance costs over the very long term, unlike a painted structure that requires regular touch-ups

 

Easy delivery and assembly

  • Kit building delivered with its assembly plans to the address of your choice or the nearest port
  • Easy assembly using a lifting device and a few tools, even without technical knowledge thanks to the pre-drilled structure
 

Manufacturer's insurance and tax-free billing

The best-value market price

  • The budget is focused on your primary need: you only spend on the essentials and not the accessory.
  • 20 years of expertise and hundreds of customers testify that our prices are the most competitive on the market
 
 
The prices mentioned are VAT excluded and do not include the cost of transport which will be communicated to you by our team of sales experts.
Non-contractual illustration photo.

Translucent sheets, smoke vents, zenithal vault: let in natural light to save energy
Reinforcement of roof's static load in order to receive photovoltaic panels
Condensation controller – Galvanized interlocking gutters with high evacuation rate – Cladding: Enclose your metal building
Insulation with our sandwich panels: eliminate temperature differences to benefit from a comfortable work space
Openings: adapt the space to your business: sliding door, sectional door, metal curtain, windows
Additional 5 and 6m spans: increase the surface area and length of the building
Canopies: add one or two canopies to increase the covered area
Mezzanine: increase the usable area of your building and create independent spaces
Overhead crane or a feed claw: we adapt the resistance of the building and provide you with a runway
Hinged mounting on base plate, mounting at level 0 instead of flush mounting

Delivery

  • Following your order, one of our experts will contact you to confirm all the details of your delivery (time period, tonnage, unloading, estimated date).
  • Allow 12 to 16 weeks on average for our buildings.